几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 12:12 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 concrete frame with masonry block infill

concrete frame with masonry block infill
hi,
i have a three storey structure with the primary load resisting system being a reinforced concrete frame. i do have masonry infill and herein lies the question.
at exterior wall locations, how do i detail the masonry wall connection to the r/c beams such that it can transfer wind loads to the upper and lower beams but does not transfer gravity loads to the frame below.
the architect is also concerned about the hairline crack that will develop between the wall and the beam.
any comments?
thanks

i'd limit the deflection of the concrete beam to l/600 and tell the architect to design a window or something.
has he seen cracks in masonry due to deflection of concrete beams?
use head restraint ties.
tomfh,
can you little more elaborate on head restraint ties? are there any commercial brands? can they be fabricated on site?
clefcon
they are generally proprietary products. there are a number of brands.
here is one example:
these connectors will form a working joint on the exterior face of the building. this may create a waterproofing problem and will crack finishes.
in most concrete buildings the majority of gravity loads are the self weight of the structure itself therefore the majority of the deflection occurs before the infill walls are placed. i have always made a hard connection to the beam above and require that the connection not be placed until all shoring/reshoring has been removed. this will allow for load transfer thru the walls in accordance with stiffness. this detail has been used in south florida for years and i am not aware of there ever being a problem.
the conection can consist of threaded dowels into form savers, embed plates in the concrete beam with a plate welded after forms are removed, dovetail anchors, epoxy dowels, etc.
we do lots of condos with p/t slabs. same question with infill exterior masonry walls. pvc sleeves are placed thru slabs to allow for vertical reinforcement to continue thru the slabs. as far as i know everyone uses this detail without problems and in this instance the edge of a slab isn't nearly as stiff as an edge concrete beam.
fortunately concrete is a very forgiving material and it will redistribute loads whenever possible if it is overstressed.
thanks ron,
i do, and i'm sure the architect will share the concern about the waterproofing and cracking issues with the use of the wall restraints.
ataman
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
【转帖】set Block Attribute Values yang686526 DirectDWG 0 2009-05-07 03:36 PM
【转帖】memory leak issue yang686526 DirectDWG 0 2009-05-06 05:37 PM
【转帖】grouping in svg based on block hierarchy yang686526 DirectDWG 0 2009-05-05 11:41 AM
【转帖】cloning a block yang686526 DirectDWG 0 2009-05-04 05:50 PM


所有的时间均为北京时间。 现在的时间是 04:32 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多