默认 concrete placement in sub freezing temperatures

concrete placement in sub freezing temperatures
good day - any experience with concrete placement at temperatures in the 20f to 40f range without use of heat? some manufacturers admixtures are advertised to protect the concrete down to 20f. ever the skeptics, we are seeking input from unbiased, experienced sources. situation is lightweight concrete on metal deck, 16 story building. currently using heaters, tarps, and moisture control with apparent, albeit costly, success. aci 306 is our bible. specifically the question is, have you had success using an accelerating admixture and placing concrete without use of heat at temperatures approaching 20f? if so, did you implement any other procedures to help ensure success? and finally, was there any discernible loss of strength evident in the test cylinder breaks? thanks in advance for any feedback.
check out our whitepaper library.
wiff,
it has been my experience that placing concrete in cold weather the key is to let it develop its initial set (500 to 1,000 psi) then it can cool until it freezes with out (too) much damage to the matrix.
several solutions:
add an excelerator, to the normal strength concrete.
increase the strength by 1,000 psi.
then cover the slab, top and bottom, to conserve the heat the concrete is generating while curing.
field cured cylinders (cured on site under the blankets on the edge of the slab) will prove if you have been effective.
as an asside, the slower concrete sets the stronger it becomes. after the initial set, the cold concrete will develope a higher 'ultimate' strength than concrete that is hot. that is one reason that cooling pipes were set in the mass concrete placed to form hoover dam.
if you are pouring concrete on a metal deck in tempertures below freezing, then i think the method you are currently using is the way to go, expensive, but the best solution.
thin sections on metal deck don't generate a lot of heat, at least they don't retain enough when poured on a frozen metal deck. warm the deck before the pour, heat the poured slab for 24-48 hours, then let it cool down slowly and move to the next slab.
that's my two cents.
rjeffery & jheidt - thanks for the input. in way of feedback, we are staying with the heat and increasing the strength by at least 500 psi. concrete is being covered with visqueen for 2-3 days, weather dependent. the much bigger challenge turns out to be how to soak the lightweight aggregate in sub freezing temperatures when the plant "doesn't have the capability". for this we've gone to aci 304 which permits some water addition on site to account for absorbed moisture. ultimately, slump at pump discharge, cylinder breaks, and follow on testing will be the deciding criteria. again, thanks. - wiff
rjeffry was right on the money and a better solution. insulated tarps on the top and insulation against the underside of the metal decking. i have poured slabs like this and have had to occasionally let some cool air in. it will stay warm a minimum of 3 days if insulated properly.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete friction coefficients huangyhg 产品功能分析 0 2009-09-08 12:12 PM
concrete failure along steel surface huangyhg 产品功能分析 0 2009-09-08 12:05 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 12:53 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多