默认 crack control for rectangular concrete tanks

crack control for rectangular concrete tanks
i have been using the pca rectangular concrete tanks book to design some wwtp tanks, as well as, other tanks. i have developed some questions based on the procedure. i am looking for others experience to get a feel for the final design.
my concern is with the crack control req'd steel. i am required to maintain 3 5/8" cover on the steel when i compute the stress in the steel. this is due to the deneef swellseal bead to protect the steel at the cold joint and make the tank water tight. the bead requires 3" of cover and the bead is to be 5/8" in order to maintain a waterproof joint. because of this, my max spacing for the rebar to control cracking ends up being less than 4" (unreasonable). the only way i can see to fix this problem is to increase the size of my wall or reduce the cover on the steel. my tank is a small 12'l x 8'w x 12'h tank. i have been trying to maintain a 12" wall. it just seems excessive to increase the wall thickness to 1.5' just to increase the steel spacing.
the other problem i have is the buoyant force. the wwtp is located on the side of a hill, so i don't see how the soil could become saturated long enough to lift the tank, but the calculation shows that my fs is less than 1 and i have to increase the walls and slab to be huge to get the f.s. to even be 1. i don't see any other way to make the tank heavy enough to resist the buoyant force.
so, i guess my question, on this small of tank, do you go to the extent of installing helical piers or is there other justification for resisting the buoyant force? also, is my crack control spacing out of control? i just need a feel for good practice to know whether i am not trying to make the tank too small, and should be looking at thicker walls, slabs, etc. mass concrete or economy?
thanks for your comment/sorry for the long explanation!

if you have more than 2" clear cover, use 2".
use 2" in crack control cal. (if i re
put the bead where it is required to be and the steel at 2" cover. why put the bead outside the steel?

for uplift, i would try to make the base slab larger than the perimeter of the wall. draw a line (35 deg from vertical - consult w/geotech at final design stage) and include the enclosed soil weight. automated drainage system (sump pump & drainage fabric) may be helpful, but failure-prone (fabric could be clogged by fines that restrict flow, power outage..etc).
perhaps helical anchors could be used to resist buoyant forces? cost is ~$1500 each.
additional weight of concrete might end up being more economical though.
so, kslee 1000, i can still use 2" in the calcs even though it is more like 3 5/8"?
for civilperson, i would like to put the swellseal bead in front of the steel to protect the steel at the cold joint at the bottom of the wall. however, maybe i am being over conservative. i am assuming that the wastewater from the tank would leak into the cold joint and corrode the steel away. am i correct in my thinking?
cuels:
yes, that was our practice (for water retention projects). i remember there was a paper discuss that, unfortunately, i don't have a copy on hand.
the argument above is similar to the aci consideration of "architectural columns" vs "structural columns". the excessive area serves a function but structural. hope this helps.
concrete is not water proof, even with no cracks. the normal cover and density has a permeability to moisture that allows small amounts of water to transverse the thickness of the wall. this amount is not determental to the steel reinforcement since the initial coating of oxide prevents further corrosion.
i have no intention to debating reinforced concrete behaviors, there are many knoweledgeable persons handle that. just want to point out the fact that water tight (actually dense - low permeability) concrete has been widely used in water front projects for many years. to counter buoyancy, and for better protection of reinforcing steel, the structures are usually massive with clear cover arranged 4"-6". that's the reason we investigated, and determined to use 2" for crack control calculations. we provided concrete keys/grooves and continuous water stops along all construction joints to lengthen the path of seepage. some of projects (submerged powerhouse) are more than 30 years old, i haven't heard any structural problems yet. please note the reinforcement were plain grade 60 steel, no coating, and no water proofing was applied inside or outside.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
circular conc. tanks huangyhg 产品功能分析 0 2009-09-07 11:42 PM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 08:59 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多