几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 04:47 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 deflecting falling ice

deflecting falling ice
due to a broken steam line, ice forms at the top of a stack. it would cost million $ to shut plant down to repair. it may cost >$50,000 if large pieces of ice land on underlying equipment.
assuming that the ice weighs about 500kg and fall for a height of 100.0m, what is the resulting force on any structure built to protect the underlying equipment? how is this force affected by deflecting the ice with a sloped surface.
any information regarding the behavior of falling ice (i.e energy/momentum transfer/absorption due to the ice breafing) and any corresponding guidance on the design of the structure would be helpful.
check out our whitepaper library.
the force can be computed if you know how quickly you want to bring the moving ice to a halt.
force=rate of change of momentum =m*(v2-v1)/t
m=mass 500 kg as per your specification
v2=final velocity=0.0 m/sec for dead stop or (-)ve value for rebound velocity
v1= velocity at strike, m/sec = sqrt(2*9.81*h)
where h is height, 100 m as you said
t= time, sec within with the change is done from v1 to v2 (1 sec? 2 sec? or just a fraction of it? )
now the million $ question is what value is to be taken for 't'? if the surface can act as a spring and a shock absorber, you can use a higher value for t and bring down the force. but if it is a tough surface with hard fixity, t goes less adding to your worries. so try to use a softening of the surface and insert some cushioning by way of adding fluid, dashpot, springs etc.
hope it helps.
this problem, with its wording and all, sound straight out of a textbook.
mikeh,
i do not have experience in protection structures against falling ice, but the followings are general comments that could apply to structures subject to impact energy :
a 500-kg mass falling 100-m produces a very high energy that need to be absorbed. i do not know what would be the energy absorption of the ice block, but i assume it would be at least 50% of the total energy. in the design of docks, the ship is assumed to absorb 50% of the energy, and the dock and fenders are designed for the other 50%.
i think that sharp edges on the top of the protection structure that help to break the ice block would decrease the energy transmitted.
the force to be taken by the protection structure depends on how much the structure displaces when hit by the ice block. the more it displaces, the smaller the force per the formula: design energy = force x displacement in the direction of the force.
a sloping top (say 45 degrees) will help to reduce the force on the structure. the reaction force would be normal to the sloping surface, and could be decomposed in vertical and horizontal components. the structure would displace both, vertically and horizontally reducing these forces accordingly.
hope this will be of some help. good luck.
aef
some alternatives that you can try:
1. hydraulic boom: this is extensively used in water-reservoirs to prevent flowing debris from entering the intakes. this is nothing but a sort of floating (pontoon) bridge with net which allows water to pass through but not any solid flowing debris. you have arrangements to remove the solids periodically.
2. rock nets: this are strong wire fabrics with elastic fixing to catch the rolling rocks on steep mountains to prevent downstream structures.
you can find plenty of manufacturers of these if you fire a query in google.
see which is suitable in your case. i dont know your general arrangement, but i think one of these two will satisfy your requirements.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
asce7 ice loads huangyhg 产品功能分析 0 2009-09-07 01:26 PM
land ice sailing explanation required huangyhg 精密机械 0 2009-09-05 11:04 PM
horizontal stabilizer anti-ice huangyhg 精密机械 0 2009-09-05 10:58 PM
material choice for a ice cooler huangyhg ISO standards 0 2009-09-05 07:16 PM


所有的时间均为北京时间。 现在的时间是 09:07 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多