几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 06:43 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 difference between transfer length develop. length in pres

difference between transfer length & develop. length in pres
what is the difference between transfer length and the development length in prestressed concrete?
silly question yes, but i thought at the end of the transfer length my strands would be developed for my prestress force, 0.7% fpu * lossess. why then would i need the development length in any of my strength calcs if i'm designing for an effective prestress force?
danke
clansman
if a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." code of hammurabi, c.2040 b.c.fff">
check out our whitepaper library.
development length is a term i apply to rebar. when used with strands, it has the same meaning as transfer length at the ends of
this is a topic that can be somewhat confusing, so it's not a silly question by any means. the transfer length of a strand is the length required to transfer the effective prestressing force (f_se, or prestressing after losses) to the concrete
it appears that transfer length is for servicibility calculations whereas the development length is for strength calculations. this is different than what civilperson posted.
clansman
if a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." code of hammurabi, c.2040 b.c.fff">
essentially, yes, that is my understanding. it's been awhile since i've done any prestressing calcs, but a general rule of thumb i've tried to remember is that when you are calculating stresses in the concrete at the service level (such as at release according to 18.4 in aci), you are to use f_se, which applies to the transfer length. when you are calculating nominal strengths and stresses in the steel strands, you use f_ps, which applies to the development length.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
development length of reinforcement in shear huangyhg 产品功能分析 0 2009-09-08 06:30 PM
cantilevered beam backspan- unbraced beam length huangyhg 产品功能分析 0 2009-09-07 10:42 PM
calculation of guy wire length for tall guyed mas huangyhg 产品功能分析 0 2009-09-07 10:07 PM


所有的时间均为北京时间。 现在的时间是 05:49 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多