默认 dump truck axle loading - while dumping

dump truck axle loading - while dumping
a project i am currently working on has an area where dump trucks back into the building and dumps aggregate into a bin and hopper system. the entire system is elevated and i need to design the support beams for the truck. i am familiar with aashto criteria and impact loading, but this is all for the truck while it is moving. i am designing for hs-20 and 32 kip axle load.
once the trucks stops over the bin and begins to dump its load, common sense tells me the centroid of the load moves further back toward the rear axles and the axle force will increase. once the material begins to slide out of the truck, the load will come back down. how can i quantify the maximum load without knowing the exact model of truck that will be delivering the material?
lastly, what spacing should i use on the beams that will pick up the wheels of the truck. i am planning to use a stocky w12 with up to an 18" wide to plate with stiffeners to support the wheels. i am assuming that if i can pick up one wheel on each side of the tandem i will be ok. the overhead doors are only 10 ft wide, so if the truck is not inline with the window, it won't be able to make it inside the door. the architect involved is researching the beam locations, but i would like to be able to verify this dimension on my own. the hopper has a grizzly system that the manufacturer tells me can support the weight of the truck, but i am not too confident that it is actually engineered. if the wheel does not align with the beam, the grizzley should be able to transfer the load back to the steel beams i will specify.
thank you in advance for all your help.
a couple of things to keep in mind- some of the dump trailers raise the front axle which transfers all the rear weight onto the back axle when dumping. and depending on the locality and patrols, loaded weights can run somewhat over the legal limits.
you first need to research some of the load rating trucks in the local or for that state or county. it is unlikely that you actually recreate the dump truck loading configuration. the aashto vehicles are not acutal vehicles but are design vehicles and as such should represent the maximum loading you may see. however a quick check of the operating and inventory vehicles checked for load rating by the county or state will confirm this.
if the hs20 doesn't agree with you most interstates these days are designing for hs20 modified or the hs25 loading. so the axle load is 40 kips not 32 (25% increase hence the 25).
don't forget that your elevated ramp has to be designed for the entire truck and not just when dumping. as a result you could have several different truck placements for maximum loading. that is, what creates the maximum positive moment in the span may not create the maximum reaction at the support or hopper.
as for the beam spacing - if you have a structural slab to transfer the vehicle load, the beam spacing won't have to exactly match the wheel lines of the dump truck.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
you must certainly design for everything that qshake said, but to give a direct answer to your question:
i'd find out what the front axle load is on your particular hs loading. for the case when the truck dumps, i'd take the front axle load and add it to the rear axle load, essentially balancing the entire truck and its cargo on the rear axle(s). this is the most it could be, neglecting dynamic effects.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
designing for impact loading huangyhg 产品功能分析 0 2009-09-08 06:14 PM
bridge loading huangyhg 产品功能分析 0 2009-09-07 05:13 PM
bridge loading factor huangyhg 产品功能分析 0 2009-09-07 05:12 PM
arema loading behind retaining wall supporting tracks huangyhg 产品功能分析 0 2009-09-07 12:49 PM
使用vs的debug模式来追踪内存泄漏 google 内存泄漏 1 2006-12-26 11:24 PM


所有的时间均为北京时间。 现在的时间是 12:59 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多