默认 eliminating torsion design

eliminating torsion design
i have a 42 foot long w24 roof beam that needs to support 12 vertical feet of brick with stud backup below. i have c6 channel hangers every 6 feet supported from w24 and a plate in between 6 inch stud backup. the c6 hanger supports an 8x6 tube lintel with angle welded to it to catch brick. the centerline of backup is 17 inches away from the w24 beam. there will be a kicker from tube to w21 that is six feet away. calculating the torsion along with dead and live load leads to a w24x84. can i neglect the torsion if i provide a w10 beam on other side of w24 at every plate/c6 hanger location? the w10 beam will connect to the w21x44 six feet away. this location is at the metal deck roof level of a one story building
find a job or post a job opening
have you thought about placing kickers from the bottom flange of the w24 back to the top flange of the w21 at each hanger location to eliminate the dead load torsion from the brick?
with wide flanges you have three main choices:
1. design the wide flange for the torsion, checking the strength as well as the stiffness/stability. with wf shapes the stiffness is very very small.
2. remove the torsion from the supporting wf by providing an alternative load path (per haynewp). kickers, etc. are what is typically done.
3. support the brick in some other way from the ground - you would still have the lateral wind/seismic to path up to the roof, though.
it sounds like you're proposing to use a w10 beam in flexure to take the torsion from the w24. i suppose that falls under jae's no. 2 suggestion. i don't see a problem with it as long as you check everything. i've done something similar in the past when i didn't have room for a kicker. i'm almost sure a kicker would be cheaper if you have the clearance for it. moment connections tend to be pretty expensive.
can the w24 be dropped to have the w10's run over the top to pick up the hangers?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
connections for torsion huangyhg 产品功能分析 0 2009-09-08 01:18 PM
concrete edge beams huangyhg 产品功能分析 0 2009-09-08 12:02 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM


所有的时间均为北京时间。 现在的时间是 06:02 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多