几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 08:50 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 existing - new basement wall connection

existing - new basement wall connection
i need to connect a new wall into existing wall. the thing is i am connecting it it in the middle of the wall span. how do i know that dowel epoxied 6" into the existing at 16" o.c. is good enough to make the combined wall as one unit (instead of a hinge point in the middle). my new wall is going to be reinforced 16" o.c. both directions. how do i figure out the development length of the epoxied #5 rebar?
check out our whitepaper library.
coengineer,
what type of masonry, thickness, wall support configuration?
what are the supports at the sides, top and bottom? can you make it span the other way?
need to know more before we can give you any decent advice.
csd
8' tall existing concrete wall spanning about 20' (soil only on one side). then at 20' the wall dropped to only 3' tall with framed wall for about 5 feet. (so the total length is 25 ft). we are going to build concrete wall instead of framed wall at that 5 feet section and it will filled with soil on the other side. pretty much we are moving a garage door on the other side of the garage so the wall has to be all concrete because we need it for the driveway. the garage floor framing will sit on top of this wall.
a few comments:
check your footings.
if this is a cantilever wall then you may only have reinforcement on the outside face, no help for spanning.
if it is only 3' high, it would be a much better job (and probably cheaper) to demolish the 3' of wall and build a new full height wall.
would recommend hilti hit re500 for reinforcement bonding, they have charts that give required depth for full development.
cmu may be cheaper than concrete in this case, particularly if there is no other concrete work on site.
regards
csd
since i may be an engineer with a well known adhesive anchor mfg, i will note the following. if you want to develop the rebar using principals of anchor theory (concrete breakout or bond failure), use the depth noted in the mfg's tables. however, if you want to have the rebar develop as a lap splice and have the new rebar transfer the load into the existing rebar, you will want to embed the rebar into the existing slab to the lengths in aci 318 chapter 12 using the epoxy/adhesive. if you have a certain red and black 2006 product technical guide, take a look at page 83 for a short explanation of this.
packerfan is exactly right. embedding the new bars into the existing wall 6" or 8" will only develop the new bars--the bars in the existing wall will not be developed. you should tear down the 3" of existing wall and pour a full height wall.
daveatkins
why do you need full moment transfer? can you design the new wall as cantilevered and have pin connection to the existing wall?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cracks in new cmu basement wall huangyhg 产品功能分析 0 2009-09-08 02:27 PM
connection design at top of basement wall huangyhg 产品功能分析 0 2009-09-08 01:11 PM
concrete basement wall design huangyhg 产品功能分析 0 2009-09-08 11:39 AM
basement wall design huangyhg 产品功能分析 0 2009-09-07 02:35 PM
20 high basement wall and diaphragm huangyhg 产品功能分析 0 2009-09-07 08:23 AM


所有的时间均为北京时间。 现在的时间是 07:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多