默认 filling voids above underpinning

filling voids above underpinning
hello-
my office is underpinning a c.i.p. concrete column spread footing and adjacent continuous concrete wall footing with concrete, placed in phases. comments in a previous thread on this topic were very useful but i have an additional question.
in plan, the column footing to be underpinned is about 3.5' square. the underpinning conc will be about 4.5' tall. to finish the finalt two or three inches of the underpinning, usual practice here is to use steel wedges every six inches or so and then dry pack grout to fill the remaining voids below the existing footing and above the cast-in-place underpinning. the wedges are driven first, and act to "preload" the underpinning to try and minimize any vert deflection after the existing footing is fully supported by the underpinning. grout is then added to fill all remaining voids and provide full bearing below the existing footing.
i have noted previous comments in another thread on how light, in actuality, the load on the underpinning is.
however, i would still like to get the full bearing area under the existing footings filled solid. the relatively large plan area to be grouted makes getting the grout in a problem, though. if we pump it, it will just run everywhere. don't see how placing the grout in dry-pack or liquid form by hand can get all the area required, either.
one possible solution might be to omit the grouting and just carry the phased concrete underpinning all the way to the underside of the existing footings in a single lift, but i would be concerned that shrinkage of the curing underpinning concrete would tend to allow deflection of the underpinned area. even a relatively small vertical differential movement between the underpinned and non-underpinned areas may cause cracks in the existing walls.
this concern might be minimized by placing the underpinning concrete in two separate lifts, but doing this may will probably take a lot of time.
is there a practical solution to this problem that one of you may have used successfully? maybe i am being too fussy, i don't know.
check out our whitepaper library.
squidale:
the usual method is a drypack grout consisting of one part cement to three parts sand with only sufficient water to allow the mixture to form a cohesive ball. this is then rammed into place with a 2x4.
most underpinning is done under walls so there is a solid surface to ram against. in your case you may need to do the grouting in stages as the footing is open on all four sides. or you could provide a form at one or more edges as a barrier.
usually, steel wedges are not used. a column footing as small as yours would probably be underpinned using two or three underpinning piers. when underpinning a column footing, you should not undermine more than about 25% of the footing at any one time (unless you have totally picked up the column and its total load in some other way). the morning after a pier is poured, you should drypack as redheadfff"> described. i usually do not use steel wedges. wedges can interfere with installation of drypack. plus, by the time you installed the wedges, you could have drypacked the underpinning pier. when you drypack, you push the drypack material back into place with the end of a flat 2x4 toward the back of the pier. then you hit the end of the 2x4 with a small sledge hammer to ram or pack the drypack tight. keep adding drypack and packing it into place with the hammer until the exposed bottom of the footing is completely drypacked. this will properly transfer the building load evenly to the underpinning pier.
the same method is used to drypack an underpinning pier along a wall.
when you pour an underpinning pier, before the concrete hardens, make sure that a 2x4 can reach all the way back to the rear of the pier so that the drypack can be properly compacted.
refer to other underpinning threads for discussion on concrete shrinkage.
pouring the concrete up to the bottom of the footing (without drypacking) is a last resort in my opinion. i've done it occasionally, but don't recommend doing it.
thank you for your comments.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
filling a gap between two buildings huangyhg 产品功能分析 0 2009-09-09 11:46 AM
【转帖】f Filling Problem yang686526 DirectDWG 0 2009-05-07 05:26 PM
【转帖】rue Type Filling yang686526 DirectDWG 0 2009-05-07 05:23 PM
【转帖】problem about filling color for area yang686526 DirectDWG 0 2009-05-06 10:32 PM
【转帖】polyline filling yang686526 DirectDWG 0 2009-05-06 10:14 PM


所有的时间均为北京时间。 现在的时间是 06:22 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多