默认 fire wall loading

fire wall loading
does anyone know of a code reference to the load required for a fire wall to withstand after collapse of one side of the building? ibc section 705.2 says the wall must not collapse after "collapse of construction on either side" - but my question is, under what load?. if it is now an exterior wall, does it need to withstand code required wind and seismic loading? this seems very conservative. i have arbitrarily used 10 psf in the past, but would like some verification. any help?
i think the theory is two-fold:
1. if there's a fire, the collapse of the adjacent portion of building should not instigate the collapse of the other. - talking about connectivity here.
2. once the other building has collapsed, then you now have a mess on one side (fire damaged building) and a structurally safe building on the other which has been protected by the firewall and can continue to be occupied.
the logical process would be that the damaged portion could be subsequently cleaned up while the other serves as a code-safe structure, not requiring any heroic stabilization efforts. if you design for only 10 psf, then you now have a clean-up on one side and a stabilization project on the other, which may be ok with the code, but may not be ok with the owner to have to deal with.
i don't think the code specifically addresses this, but it seems that you could more simply design for the higher component wind load and make life simpler if indeed a fire did occur.
jae,
thanks for your thoughts. however, if i were called to evaluate the condition of a building adjacent to a fire wall which remains after a fire burned the other side down, i would first stabilize this fire wall. the code says the fire wall must be stable "for the duration of time indicated by the required fire-resistance rating." this implies that it need not be designed as a permanent exterior wall - or in my opinion, even a wall to remain during clean-up without evaluation. any thoughts?
rrmiv - yes, i agree with you that the code doesn't absolutely require the exterior wind load capacity. i was just suggesting that there is some wiggle room here for you and your client to discuss as to designing this wall so you don't have to stabilize it after a fire.
i know the probability of a fire is probably small, but you could very easily offer your client a comparitve cost estimate for the two concepts and let he/she decide which way to go.
just be clear to them that they aren't obligated to have more than a 5 or 10 psf interior wall capacity, but should a fire happen, they could spend x amount of money to avoid the potential later expense of stabilizing the wall...as the re-build time would be long enough to require a full code wind capacity.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
existing masonry wall and sliding foundation huangyhg 产品功能分析 0 2009-09-09 08:55 AM
concrete seawalli-wall huangyhg 产品功能分析 0 2009-09-08 12:35 PM
concrete basement wall design huangyhg 产品功能分析 0 2009-09-08 11:39 AM
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
buttress wall relative rigidity huangyhg 产品功能分析 0 2009-09-07 05:57 PM


所有的时间均为北京时间。 现在的时间是 07:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多