默认 hss column splices

hss column splices
i'm designing a column to be fitted for a four-storey building. the ground & 2nd floor will be hss 6x6, while the last two floors will be hss 4x4.
are there visual examples that can be used as detailing for the splicing connection of these two different size columns?
what beam types are framing into the hss columns?
mike mccann
mccann engineering
these are columns to be spaced at 10 ft o/c - with w10x15 framing to each side. i'm planning to splice the hss6x6 ±18" above the floor. (it's all within the wall composition.)
i have used telescoping hss splices for this type of situation almost exactly, except the size difference of the column below to the one above was a lot smaller. like 1/2 size difference i believe it was with shear tabs welded on the sides of the upper column. i just posted something about that on here not too long ago. you may need to use bolted plates at the splices due to the size difference.
instead of baloon framing this, to simplify the connections, why don't you have the w6 beams rest on top of the hss sections with steel bearing plates, and the hss columns rest on top of the beams on steel plates? typical steel detail construction. kiss! then there is no problem with the hss 6 to hss 4 connection.
mike mccann
mccann engineering
i have used steel beams continuous over columns before, and i have seen it done a million times, but i never really liked this detail that much just because any moment being transferred from the beam into the lower column is ignored. at floor cantilevers i put it in of course, but for a standard interior column i don't normally use it. i worked with another engineer before that also avoided this connection for the same reason. it is likely fine but i don't normally use it.
i normally would prefer mike mccann's solution, but with such small beams, you need to make sure that the column load can get through the beam via stiffeners. if the beam cantilevers, the stiffeners also will need to brace the bottom flange.
i'm not sure about your rational for decreasing the column sizes, but have you considered that the extra labor to fab and install your splices (or stiffen beams) may well offset any savings from just keeping hss6 x 6 continuous.
thanks for all the responses so far. grizzman, i might just increase the thickness of the lower columns so that the splice detail is simpler; or, go for hss5x5 throughout.
it's just that there are close to 170 columns to deal with.
i'm not a big advocate of "stiffening" the beam over the column.
i agree with keeping the same size column thruout and then using welded tabs bolted together on the sides to erect the column. connection can be field welded and tabs removed.
for different size columns, use a cap plate on the lower column and field weld the upper column to it.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
hss beam to hss column shear connection huangyhg 产品功能分析 0 2009-09-09 06:01 PM
gusset plate at hss column huangyhg 产品功能分析 0 2009-09-09 03:28 PM
existing steel column analysis huangyhg 产品功能分析 0 2009-09-09 08:59 AM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM
another aci slender column question huangyhg 产品功能分析 0 2009-09-07 12:13 PM


所有的时间均为北京时间。 现在的时间是 05:16 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多