默认 inspection building pit retaining walls

inspection building pit retaining walls
i'm designing an vehicle inspection building to check commercial vehicles. it is a single-bay facility, 18 feet wide by 80 feet long. the center of the bay has an inspection pit 6 feet deep by 3 feet wide, running 70 feet long to allow a person to wall underneath a vehicle to inspect the undercarriage. there are trench drains that run along the entire length of the pit at the floor level, so the concrete floor is not tied to the walls of the inspection pit. the design vehicle is an hs20-44. i've designed the walls of the pit as retaining walls to withstand the soil pressure and the surcharge load of the vehicle. problem is, the base of the pit retaining walls works out to be 15 feet wide, since it's one slab to accomodate both walls of the pit. i might as well extend the base to the perimeter of the building and make it a raft foundation.
does this sound right? i've tried to figure out a different way to design the walls of the pit so that they don't need such a huge base slab, but nothing is coming to mind.
find a job or post a job opening
which floor level are the trench drains? pit floor or ground floor?
since there is typically concrete placed under the trench drain, could you increase the concrete thickness under the trench drain (if needed) and tie the floor slab to the top of the pit walls? depending on how deep your trench drain is, this "u" shaped section of concrete around the trench drain may provide some good resistance for the wall.
the trench drains are at ground level, thus in the way of tying the floor slab into the pit walls.
after sending in this post, i thought of looking at this differently. since both walls of the pit will essentially be loaded at the same time and at the same load, it's possible to design this more as a "u" shaped concrete structure resisting the moment at the center of the pit floor instead of having a huge base extending away from the pit. then, it's just a matter of making the pit floor slab thick enough to carry the double moment of the walls.
i would approach this like a u-shape. any unbalanced moment will just cause a slight rotation in the opposite wall pushing it into the soil harder and this can easily be absorbed. (assuming free at the top). this will be the best design.
aggman,
agreed. i've already taken that approach. thanks for the confirmation!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cheating on retaining wall calcs huangyhg 产品功能分析 0 2009-09-07 11:25 PM
buttress wall relative rigidity huangyhg 产品功能分析 0 2009-09-07 05:57 PM
building inspection standard huangyhg 产品功能分析 0 2009-09-07 05:38 PM
below grade masonry walls huangyhg 产品功能分析 0 2009-09-07 03:22 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 01:16 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多