precast wall panel attachment help
i am currently designing a steel framed building with precast wall panels as the exterior facade (non structural). there are quite a few windows in the building and some of the precast panels need to be hung from the steel perimeter beams. it's approximately 800 plf of load on each beam, and is about 11 inches away from the beam centerline. therefore there is an eccentric load occurring, which i am taking out using angle kickers to the top chord of joists/beams. does anyone have experience with the detailing of the attachment of the precast to the beam? an angle at the top of the beam? one at the bottom? any suggestions would be greatly appreciated.

in order to prevent torsion on the beam, the kickers need to be from the bottom of the beam rather than from the precast. probably you knew that.
for the supports of the panel, i think you would need connections at both the top and bottom of the beam. i would provide vertical slots at one location, probably the bottom, so the gravity load is delivered to the top flange, and the horizontal load is supported at both places. for the horizontal load, two angles would work, but for the gravity load, some stiffening would probably be required to deal with the 11 inch eccentricity.
sometimes the precaster can supply a structural steel connection, which projects from the back face of the panel and loads your beam at the centerline (minimal torsion on your beam now). the moment is taken into the panel, rather than your beam. if the moment is too large in the panel, maybe they can locally thicken the concrete at the connection locations, to prevent cracking.
if the load bearing connection in the panel is near the top of the panel, then you need something near the bottom of your panel to prevent the bottom of the panel from coming in (a separate girt, or if your beam is deep - use the bottom of the beam flange - then you would need to check the torsion in your beam in that case.
if the load bearing connection is near the bottom of the panel, then you need a tie-back connection near the top of the panel.
and usually each precast unit has only two support points per panel. pci design handbooks and other resources out there have a number of details. pci even has an architectural precast handbook that has mostly details on this topic:
architectural precast concrete, 3rd edition - mnl-122-07
is there any practical detail for hanging precast spandrel. is there any link which is free.
can you make the precast panels span column to column? then you just need a haunch off each column to support the panels. threaded rods near the bottom of each panel can connect back to the columns for lateral loads.
daveatkins
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
foundation wall 40 feet below grade huangyhg 产品功能分析 0 2009-09-09 01:38 PM
cutting openings in precast wall panels huangyhg 产品功能分析 0 2009-09-08 04:21 PM
concrete basement wall design huangyhg 产品功能分析 0 2009-09-08 11:39 AM
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM


所有的时间均为北京时间。 现在的时间是 08:13 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多