几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 05:43 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 reinforcing pipe columns

reinforcing pipe columns
anyone have any ideas on reinforcing steel pipe columns? i've got 4" nominal diameter steel pipe columns, wall thickness unknown. they dont work with the new loads applied (nor do they work with the original loads..). so, to reinforce, i've come up with welding 4 l2x2's to the pipe, or trying 2 l3x3's to the column. with (4)-l2's, i have a symetrical x-section, but twice as much welding. with (2)-l3's, i have half the welding, but still weak in one direction.
anyone have any other ideas besides welding angles? welding other shapes to the pipe? maybe reinforcing isnt cost effective, and replace the entire column with an adequate size?
find a job or post a job opening
i've used 2 steel channels with the toes welded to the column to increase the allowable axial capacity
replacement with with an adequate size is probably your best option - not dependent on quality of workmanship and more predictable behavior of the
if you haven't already done so, you might want to check out the previously posted question on 4-17-04 on "steel column reinforcing" and the replies for additional considerations...food for thought.
lppe, is it for a building column? if possible, replace the column with proper/adequate size.
for telecommunication towers, some times adding new secondary bracings to reduce effective length will do the job. in some stubborn cases welding shaped semicircular plate to the column is done, but that is extremely painstaking and expensive job.
i have read about filling the column with concrete is also a viable option, but did not do it personally. cidet [forgot the number] standard gives design recommendation for concrete filled steel columns, may be some other standards do that too.
again, to me the best solution is to replace the leg with proper size [assuming available construction facilities will allow you to do so.]
good luck, am
my opinion is if the undersized column is a single-story and the connections to the structure or anchor bolts are easily accessable......replace the column.
if it is a multi story column........reinforce.
single story column. exposed structure, so no room to reduce the effective length. the steel girders cantilever over the column, so the top of the column would be easy to replace. the bottom of the column is embedded in the concrete slab (presumably on a footing...).
the most economical way is to add one or two channels (c4 or c5) to the pipe with the legs faced in as chipb suggested. however you can attach the channel(s) to the pipe by screwing or powder actuated fastners to brace the the channel in it weak direction and for load sharing as welding behind the channel to a round
i would use four (4) angles to form a square cross section with the pip in the middle. i have used this in the past. of course you are lucky it is steel, you can work and make many configurations to reinforce this column.
regards
can you put additional cols. in to cut the loads in half?
lppe,
just a reminder as we sometimes focus on one and forget the other. all this reinforcing for the column due to increased loads, have you checked the foundation's capacity for the increase?
chip
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
force on pipe under bridge from water flow in river huangyhg 产品功能分析 0 2009-09-09 01:13 PM
designing columns for concrete buildings huangyhg 产品功能分析 0 2009-09-08 06:12 PM
corrugated metal pipe under a building huangyhg 产品功能分析 0 2009-09-08 02:11 PM
buried steel pipe design criteria huangyhg 产品功能分析 0 2009-09-07 05:55 PM
building a shop made from steel pipe huangyhg 产品功能分析 0 2009-09-07 05:30 PM


所有的时间均为北京时间。 现在的时间是 01:20 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多