几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 10:17 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 shims vs. leveling pls below steel baseplates

shims vs. leveling pls below steel baseplates
my office typically specifies temporary shims to be used below column baseplates during erection. i like shims because it is easier to correct and adjust column heights earlier in the project than with leveling plates. with leveling plates, if a mistake in elevation has been made, the plate and grout below it has to be taken out and redone.
what is the practice in other offices? are there other advantages to either method that i don't know about? i am noticing on most jobs that contractors ask to use leveling plates.
hi sam damon:
i used to level base plates, a nut welded beside each 90 degree bolt hole , say a nut at 12, 3, 6, 9 hour relative as old war pilot sayd.
at that nut a bolt is threaded so you can control the level and height, onece done we grout the sapce between tha base plate and the column footh.
samdamon---you have got it right. on columns with baseplates that range into the tons, leveling bolts or other devices must be used but, for the small stuff, stick to the shim packs---much easier and cheaper to erect, level and, plumb in the field. leveling nuts can be used to good effect when the base plate contains a locating device such as a key, but plates preset and grouted are a pain in the arse.
rod
my practice (as a structural engineer) is to leave the decision of whether to use leveling plates, nuts, shims, etc. up to the contractor/erector. they know their preferred method best and may submit change order requests if a different method is forced upon them. i simply specify the erection tolerances that must be met and it is up to the contractor/erector to determine how to satisfy the tolerances.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
recyled content of steel shapes huangyhg 产品功能分析 0 2009-09-15 04:57 PM
question regarding floor support beam installation huangyhg 产品功能分析 0 2009-09-15 03:58 PM
how to place minimum steel in a rectangular footing huangyhg 产品功能分析 0 2009-09-09 05:50 PM
heat straightening of steel beams huangyhg 产品功能分析 0 2009-09-09 04:00 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 08:55 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多