几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 11:21 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 slab on grade column blockout re-entrant corner reinforcemen

slab on grade column blockout re-entrant corner reinforcemen
it seems to be widely accepted that slab on grade tends to crack at re-entrant corners. please see my attached image for my question.
--does everyone here put rebar at column blockouts below the sawcut jt at re-entrant corners to prevent full depth cracking?

--why or why not?
--please comment. even better, point me towards some reference material i can read.
thanks.
for the steel column detail, i see no need for extra rebar because the diagonal joint leads directly into the sawcut.
for the concrete column detail, i would locate joints on the face of the column instead of on the centerline. add diagonal rebar where there are no joints. another variation of this is the pinwheel arrangement (no additional rebar needed)where a joint comes off of each corner.
try to keep the rebar fairly close to the column to prevent the crack from forming. if it is located too far away, the slab will still crack.

agree with jike on the steel column. we show our slab joints coming to the corners of the column isolation block (column blockout).
for concrete columns, we go with cirular column blockouts.
the diamond shape for the column blockout is the best because it doesn't give you any reentrant corners so no stress concentrators. but often you end up with square columns especially at the edges and end up with at least one reentrant corner. however, if the distance between joints is less than about 4-5m then it won't give you any trouble especially since the reentrant corner is close to the corner of your panel. i think this fact is often overlooked and these reentrant corners are not as big a problem as we think.
carl bauer
at diamond shaped column block-outs, there's no need for additional reinf. at re-entrant corners in your slab perimeter, try to have a saw-cut joint starting from that corner. if you do that, you won't need additional reinf either. otherwise, place a couple #4 bars.
a variation of the concrete column detail is to cast the slab on ground before the columns, bearing directly on the footings, and without blockouts. in this case it is better to saw the joints away from the columns. this allows the slab to shrink toward the columns, and makes the sawing simple.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
grade beam detail question huangyhg 产品功能分析 0 2009-09-09 02:57 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM
concrete spec. for slab-on-grade huangyhg 产品功能分析 0 2009-09-08 12:49 PM
cantilever steel beam at column huangyhg 产品功能分析 0 2009-09-07 10:40 PM


所有的时间均为北京时间。 现在的时间是 05:08 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多