几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 04:55 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 un-bonded p-t in bridges

un-bonded p-t in bridges
i am not aware of any new bridge projects in the usa today that use un-bonded p-t in bridge decks - please correct me if i am wrong - if this is true, why? does the aashto/dot code/s prohibit its use?
historically, has unbonded p-t been used in bridge decks in the usa or other parts of the world, and if so, does anyone have project references?
by un-bonded p-t, i do not mean to include external p-t, rather greased and sheathed strand systems within concrete decks/elements etc.
thanks in advance.
ps those of you who frequent "p-t" and "bridge" forums, i apologize for repeating this thread here, but the "structural" forum appears to have a wider cross section of engineers whom may be able to repsond to this thread.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
more problems with canadian bridges huangyhg 产品功能分析 0 2009-09-10 03:13 PM
cable-stayed bridges huangyhg 产品功能分析 0 2009-09-07 06:05 PM
bridges for rural areas huangyhg 产品功能分析 0 2009-09-07 05:16 PM
bonded topping joints huangyhg 产品功能分析 0 2009-09-07 04:21 PM
bonded floor slab 9meaning concrete slab with a concrete ove huangyhg 产品功能分析 0 2009-09-07 04:20 PM


所有的时间均为北京时间。 现在的时间是 02:39 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多