几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 06:10 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 vehicle loads

vehicle loads
i need information for vehicle loads that i can't seem to get a straight answer for. i am involved in the design of concrete pad at a plant site that will be subject to infrequent vehicle loads. the vehicles that will be driving on this pad will be pickup trucks, large forklifts and small cranes for access to a pipe rack.
i'm assuming that the crane will be the heaviest piece of equipment, but i'm finding wildly varying weights for cranes. i do not have any specific information as to make or model of the cranes that might be used. does anyone have a rule of thumb for vehicle loads that would fit this scenario?
check out our whitepaper library.
if the cranes are travelling over public roads (they are not limited to the plant site) they shouldn't create more than a h-20 load. if they were larger than h-20, all bridges, culverts and pavement they travel over to get to the site would have to be checked.
if the cranes are unloaded when they pass over the slab, i'd check for an aashto h-20 load. if they're loaded, you'll have to logically limit the type of crane and capacity that can travel over the slab.
while the crane might be the heaviest total load, my thought would be that the forklift wheel loads may have the highest concendtrated load when it makes a material lift, particularly if the forktruck is the solid wheel type.
weeber - for an industrial facility - a rule of thumb is probably the best way to go. to keep electric generating stations operational, i have seen carefully specified design criteria ignored by the personnel who are responsible for "keeping the lights on" - and rightfully so. for example, a truck crane may have to make a heavy lift at maximum radius - then the point load from one of it's outriggers is much higher than expected - this can happen anywhere on a plant site - not just in expected locations. we have found the best solution is to use high quality, well compacted subgrade material - make it quite thick. then 6 to 8 inches of concrete with one layer of rebar, to tie everything together.
for areas that are used (abused?) for heavy duty bulk material handling, 12 inch slabs with two mats of rebar (placed on the quality subgrade described above) seem to be able to take anything that plant operations can dish out.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
unfactored column loads huangyhg 产品功能分析 0 2009-09-16 05:12 PM
ransient loads huangyhg 产品功能分析 0 2009-09-16 03:35 PM
ontario building code 2006 - vehicle live loads huangyhg 产品功能分析 0 2009-09-15 10:35 AM
intl bldg code wind loads huangyhg 产品功能分析 0 2009-09-09 09:19 PM
fea on conrete slab - use real loads or factored loads huangyhg 产品功能分析 0 2009-09-09 11:24 AM


所有的时间均为北京时间。 现在的时间是 04:57 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多