几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 07:06 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 wastewater treatment blast mitigation

wastewater treatment / blast mitigation
looking for a little free advice...
are wastewater treatment facilities typically designed with an eye toward blast mitigation, under the current building codes; due to the presence of methane and other potentially flammable/explosive gasses...?
thanks,
walterbrennan
i've designed many waste-water treatment plants and i've never been asked to take this into account.
in the uk we have the dsear regulations (dangerous substances and explosive atmosphere regulations). these regulations require the designer to 'zone' areas depending on whether there are possible sources of ignition present, all the time, sometimes, feasible, etc. a dsear risk assessment must be carried out.
these have been in force since 2000 (i think, updated 2002) and are a follow on from the old electrical zoning requirements. the main difference is that they have now been extended to cover any source of ignition and powder/dust ignition as well as gases. a sourceof ignition could be two pieces of metal rubbing against one another, as in a pumping station cover. as part of the risk assessment you should try to remove the source of ignition, but it could be taken to extremes (a man with hobnail boots on a concrete floor?!?!?).
i've designed a few waste water treatment facilities and have not designed for blast forces.
design in the us is governed by aci 350. article 8.2 mentions earth, hydrostatic, wind, earthquake, crane loads, vibration, impact, shrinkage, temperature, creep, ice, and support movement. it also reads "consideration shall be given to the effects caused by interior pressure of the structure." i think aci 350 would have specifically mentioned blast in the code or commentary, if the committee thought it should be designed for.
i have never designed any wastewater treatment plants for blast loading. but we do consider it may occur. we aim to remove the risk of the explosion occuring by removing the sources of ignition at the design stage.
thanks for the response, all.
walterbrennan
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
load factor for blast loading huangyhg 产品功能分析 0 2009-09-10 11:05 AM
hud blast wall mitigation huangyhg 产品功能分析 0 2009-09-09 06:12 PM
epoxy coated rebar - wastewater treatment concrete tanks huangyhg 产品功能分析 0 2009-09-08 10:38 PM
concrete repair in wastewater treatment tanks huangyhg 产品功能分析 0 2009-09-08 12:32 PM
blast wall design huangyhg 产品功能分析 0 2009-09-07 03:54 PM


所有的时间均为北京时间。 现在的时间是 11:32 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多