几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 07:21 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 we are currently working on a proje

we are currently working on a proje
we are currently working on a project which will require a mat foundation approx 2m deep x 4m wide x 12m long.
at what point, as a rule of thumb, should we worry about heat of hydration causing unwanted cracking in the foundation (various publications state anything greater than 1m in depth can be problematic - we are looking for practical recommendations). also, what measures can be taken to combat this situation (ie: different portland cement in the mix, insulating to protect heat loss and maintain temperature differentials, etc.)
any guidance is greatly apprecieated.
dutchie
if you can get it - aci 207 "mass concrete" would answer most of your questions.
i once placed a large mat - 23' x 23' x 12' (7m x 7m x 3.65m) and we specified chilled aggregate, temperature monitoring, water curing, etc. you can vent the mat and do a number of other things to control the heat.
dutchie,
type iv cement is a slow hydrating cement for control of temperature in large pours. also admixtures for the retardation of hydration are available, check with local concrete plants for types and availability.
here is good paper that may help:
on electric generating station foundation mats up to 15' thick (4.6m) we had no trouble. this was in south carolina in the summer (air temperature 85+ degrees). used type ii cement (sets more slowly than type i). also replaced concrete mix water with the necessary amount of ice shavings to limit concrete temperature at time of placement to 90 deg or less. finally wet cured the concrete for at least 7 days.
the florida dot thinks that temperature differential and not total heat production is the controlling consideration. they specify a maximum allowable temperature difference of 35 degrees f between the interior of the concrete and the surface. this is often accomplished by insulating to prevent heat loss. other techniques include chilled aggregates and especially mix water. ice doesn't always melt where you want it to.
fdot also requires the contractor to hire a specality engineer to design the temperature control plan per aci 207. although i don't recall the number, i thought the "mass" threshold is a function of the volume divided by the surface area.
hope this helps.
grouser,
wow! i have never heard of insulating concrete in florida! i suppose insulation would prevent too rapid of a temp. rise in a hot climate, air temp 110, concrete temp. 95? i'm used to insulating up here in snow country!
if you replace some of the cement with fly ash you will get less heat. and fly ahs is cheaper than cement. i thought i read that you could replace up to 25%.
lower concrete strength means less cementitous material and therefore less heat.
replacement of opc with pfa also reduces the heat produced.
using a plasticiser to provide workability means the water content can be reduced thereby lowering the cement content while keeping the water cement ratio unchanged.
chilled water (depending on the ambient temperature) may be an advantage to keep the temperature of concrete at the time of placement to below 30 deg.c
zambo
thanks everyone,
we are on the right track now,
dutchie
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
limit state vs working stress design huangyhg 产品功能分析 0 2009-09-10 10:36 AM
【转帖】odgicontextfordbdatabaseloadplotstyletable ctb not working yang686526 DirectDWG 0 2009-05-06 08:43 PM
【转帖】is oddbrasterimagedefload90 working yang686526 DirectDWG 0 2009-05-06 04:16 PM


所有的时间均为北京时间。 现在的时间是 10:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多