shop drawings vs delivered
how many times have you seen the actual length or size of steel beams delivered not match what was indicated on the shop drawings? so far i have only seen this happen with steel joists.
find a job or post a job opening
can you give more details?
just say for instance the length difference in what is delivered is say 1 foot different than what is shown on the shop drawings. actually this did happen to me not too long ago, the beams were supplied as being too long, and the contractor cut the ends off.
i am concerned in situations where bearing is critical, if the beam is supplied a few inches too short and nobody notices, then that is a problem. it should come back to be the complete responsibility of the fabricator if something happens, (that's if the shop drawings were approved with the correct length, plus we have a disclaimer for those too anyway).
i do not check shop drawing dimensions unless the contractor asks or i find a mistake on my design plans.
having joists too short! it happened to me before. i had to accept the lengthening detail from the joist designer/supplier. it all worked out. i was not happy about it. they talked the owner into accepting it to reduce time.
what can i say, we as engineers are always faced with situations in real life that drive us crazy and that truly test us!
good luck
i've seen new steel structure to be built on an existing 3 bay steel frame, and the new steel for the middle bay was 1 foot short. however, i think someone goofed with the initial field measurements. sorry, what i just wrote has nothing to do with shop drawings.... need coffee...
i have had steel beams supplied long and short. the dimensions on the shop drawings were correct. the fabricator mis-read the tape. beam layout was being done by hand.
when they were long, it really wasn't that much of a problem, the fabricator had the erector cut the beam to the cotrrect length and drilled the bolt holes. another time, time was not a factor, so the fabricator took the beam back to the shop and cut it there....it was "cheaper" for him to take it back rather than have the erector (a sub to him) do it.
in the case where the beam was short, the fabricator shipped out a short piece of the same beam size and full pen welded it in the field. we insisted on having a cwi on site during the entire welding operation and ut testedf the joint. (actually, the cwi and the ut tech were the same person.)
so it does happen.....however, as more and more fabricators get automated, we should see less and less of it occurring.
lppe.....did you get your coffee?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
shop drawing dimensions huangyhg 产品功能分析 0 2009-09-15 10:18 PM
engineered shop drawings huangyhg 产品功能分析 0 2009-09-08 10:28 PM
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
copied cds as shop drawings huangyhg 产品功能分析 0 2009-09-08 01:56 PM
certification of shop drawings huangyhg 产品功能分析 0 2009-09-07 11:16 PM


所有的时间均为北京时间。 现在的时间是 11:31 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多