默认 beam to column moment transfer

beam to column moment transfer
i am new to raised floor design and am working on a small water tank lid. the tank is long and narrow. i was told to design it as a one way slab with a beam and columns running down the middle. in designing the beams, would you want to fix them to the columns? and if they were fixed would the moments from each beam (one on each side) cancel each other out or transfer to the column ?
check out our whitepaper library.
suggest that you assume everything has simple supports for several reasons, here are a few:
1. simple supports are more forgiving if the actual loading is different than specified.
2. with all due respect, you are "new to raised floor design".
3. unless you have a high level of control over the construction process, it is difficult to insure that the finish product will be constructed so that the beam / column connection is truly fixed.
these are things you need to figure out. don't make the mistake of thinking that you can design concrete however you want and make it work. concrete is how it is, and you have to analyze it in a way that approximates reality.
an example would be saying there are two simple span beams on either side of a column. the reality is that there is a continuous beam, and the maximum moment will occur over that column. it will only act as a simple span beam when significant cracking occurs on either side of the column (right where the shear is at a maximum).
how much moment transfers into a column from a continous beam is a function of the stiffness of the column versus the beams. if it is a negligible amount, you could treat the column as a pinned support.
if i was you, i'd figure the moments in beams and columns out on paper as well as i could, and only then put the members into a software program such as risa 3d or sap and analyze it. make sure you figure out exactly why you made your mistakes. your boss probably wants an answer "quick", but if you just rely on software, without fully understanding, you'll be giving him a solution you aren't sure is right, and next time you have a similar problem, you still won't understand it.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
beam supporting column huangyhg 产品功能分析 0 2009-09-07 03:05 PM
beam support along edge huangyhg 产品功能分析 0 2009-09-07 03:04 PM
beam strengthening huangyhg 产品功能分析 0 2009-09-07 03:04 PM
aisc 13th ed. and cjp dw moment connections huangyhg 产品功能分析 0 2009-09-07 10:27 AM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 11:05 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多