默认 cmuconcrete foundation dowels

cmu/concrete foundation dowels
our office typically does not show reinforcing dowels between a concrete foundation wall and a reinforced cmu wall. this is for low seismic areas a or b.
we use the grout on top of the concrete wall to resist shear at the bottom of the wall. the rebar in the cmu wall is usually just there for bending strength mid-height in the wall. the cmu walls start at the floor height and are completely above grade.
i'm asking what other people think because i've gotten a lot of calls recently from contractors wondering if we missed something on our drawings. i assume everyone else must be using a dowel at the bottom and maybe they have a good reason for doing so.
we dowel all our vertical wall reinforcement to the foundation including additional jamb reinforcement.
aci 530-99 2.1.8.3.2 requires 25% positive reinforcement be carried into the support. although 2.1.8.3.1.3 says that it need not extend beyond the point it is needed at supports of simple spans.
i do not want the joint at the base of the wall opening under lateral load.
we add dowels. how do you resist the lateral wind forces on your wall? using friction isn't always a good idea.

we use dowels.
personally, i usually match the dowels size and spacing to the size and spacing of the cmu vertical bars. think this is just good practice.
i've always seen and shown dowels.
how do you tie down the ends of the shear walls without dowels?
dowels are required in our area. allowing for friction is disallowed.
i have aci 530-05 in front of me and i see the section jike is referring too. it says the 25% requirement is for walls that are part of the -lateral- load system.
i understand the positive moment reinforcing needs a certain development length beyond where it is needed. i think for a lot of walls the vertical rebar probably isn't needed at the ends of the span for flexure.
does anyone have a reference where dowel anchorage is needed if the wall is not a shearwall?
there is definitely some shear capacity in the mortar to concrete wall interface, right? mortar holds cmu to cmu, so it must hold cmu to concrete, right? otherwise how do unreinforced walls function?
i'm not saying i'm right. i'm just trying to figure out the code requirements, and why other engineers design the way they do.
thanks
using your same logic, i guess there's no need to extend concrete beam bars into the support. you should always use dowels for reinforced masonry. you can't design for bending as reinforced masonry, and shear as unreinforced masonry. you are definitely out of the mainstream on this one!
see aci 530 1.14.2.2.2 and 1.14.3.3. it seems that the intent of the code is to provide a mechanical connection between the wall and all locations of lateral support. you may be able avoid foundation dowels if you provide connection to a slab, but foundation dowels would be easier.
now the question is, how many of you use dowels into the foundation wall for unreinforced cmu walls?
when wind causes net uplift and horizontal shear, what shear strength remains at the junction of wall and footing if you are using grout with a horizontal surface?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
capacity of rubble stone foundation to support concentrated huangyhg 产品功能分析 0 2009-09-07 10:52 PM
building on old concrete basement foundation huangyhg 产品功能分析 0 2009-09-07 05:42 PM
bracing top of foundation, residential huangyhg 产品功能分析 0 2009-09-07 04:44 PM
beam on elastic foundation huangyhg 产品功能分析 0 2009-09-07 02:58 PM
8000gal water tank foundation design huangyhg 产品功能分析 0 2009-09-07 08:59 AM


所有的时间均为北京时间。 现在的时间是 05:31 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多