默认 deep grout beds under steel columns

deep grout beds under steel columns
i've got a couple columns located within a slab depression, and the revised base plate elevation didn't get picked up on shops... which leaves about 7" between bottom of base plate and top of bearing surface. column loads are on the order of 400-450k, shear/moment are not concerns at this location (other than incidentals during erection), and anchor bolts have sufficient length to be set high.
refabricating the steel would cause significant delays, and forming/reinforcing a 5" long pedestal seems a bit much. other than putting some pea gravel in the grout mix, are there other significant problems with just simply grouting this space solid, maintaining 45 degrees out from the base plate?
there can be. most grouts for base plates are not intended for such a large gap. the grout would probably break or buldge out. you might be able to confine it by providing plates on all side of the base plate and a few additional anchors. i would contact the manufacturer to be used and consult with them on this, or provide additional steel to get you where you need to be. most of the ones i have seen recommend contacting them if the grout is to be placed thicker than 3 to 4 inches. that much load is too much to play with.
can you have to contractor place additional base plates so that you can get the required grout thickness down? i wouldn't think they would need to be welded for gravity loads and would be more like full-size shims.
rudely (sorry ) answering a question with a question:
so how on earth are you going to deal with the anchor rods?
the anchor rods were spec'd with 18" embedment plus 2" grout, and for the loads we're seeing here we can easily live with only 13"... and the bearing surface isn't cast yet so we can just set them high.
adding additional thickness of plate should work, and the fabrication should be pretty quick on those... we've got about 3 weeks until the first steel goes up, so that should be more than enough time to get a few more plates done. a quick call to the grout manufacturer sounds like a good idea as well, even if the base mix won't do this, it stands to reason they might have another mix that would. thanks for the quick response!
how about casting a 4" pedestal in the top of the footing? this would work better than grout and could be unreinforced at thet height.
"forming/reinforcing a 5" long pedestal seems a bit much."
i don't think it is too much, and it is the contractor's mistake isn't it?
a single tie around the anchor bolts, formwork and you're ready to pour. easier than packing in 7" of grout i would think.
what about shear transfer at the base plate?
a plain concrete pedestal 5" thick should pose no problem for the loading. this would be to reduce the cost a bit, otherwise 7" of grout would be ok. the grout is generally tougher than concrete. if the bpl is large enough, you might consider levelling plates because the grout is so thick - doesn't form a concave surface.
dik
dbuzz-
i believe he said in the op that this was a gravity only column (or at least that shears and moments were not a concern at this location).
have the contractor contact sika or the like and formulate a plan to fix his mistake. i would think sika has a grout strong enough which can be placed to the thickness you require.
since i have run into this little problem a time or two...my first was to have the steel fabricator lengthen the column, either at the shop or in the field. no one is happy except the inspector and, basically, he's the guy to keep happy, imo! i have, against my better instincts, used anchor bolt extensions (both welded and sleeved) along with a poured in place add on to the pier along with proper grouting.
keep in mind, jmorrison, that there never seems to be enough time to do it correctly, but always enough time to do it over!
rod
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cross bracing within steel stud wall huangyhg 产品功能分析 0 2009-09-08 03:57 PM
coninuous steel beams over columns huangyhg 产品功能分析 0 2009-09-08 01:09 PM
concrete basement wall cast around steel columns huangyhg 产品功能分析 0 2009-09-08 11:39 AM
brick wall between steel columns huangyhg 产品功能分析 0 2009-09-07 04:59 PM
4 story wood building with steel beams and columns at the fi huangyhg 产品功能分析 0 2009-09-07 08:45 AM


所有的时间均为北京时间。 现在的时间是 11:57 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多